Aller au contenu

Organize: Data Organization

Overview of the Organize phase in the CORE framework

Ce contenu n’est pas encore disponible dans votre langue.

Organizing data effectively is crucial for scalable analytics. This phase covers both batch processing with data warehouses and real-time processing with stream layers.

The Organize phase transforms raw collected data into structured, accessible formats. It encompasses both historical data storage (warehouses) and real-time data processing (streams) to support different analytical needs.

Centralized storage for historical data:

  • Batch processing: Process large volumes of data efficiently
  • Schema flexibility: Support for structured and unstructured data
  • Cost optimization: Use appropriate storage tiers based on access patterns

Process data as it arrives:

  • Low latency: Sub-second processing for time-sensitive use cases
  • Event streaming: Handle high-volume event streams
  • Real-time analytics: Power dashboards and alerts
  • Data warehouse or data lake configured
  • Data pipeline architecture designed
  • Real-time stream processing set up (if needed)
  • Data transformation and ETL processes implemented
  • Data quality monitoring in place
  • Access controls and security configured
  • Data Warehouse Schema: Structure for storing historical data
  • ETL Pipelines: Processes for extracting, transforming, and loading data
  • Stream Processing Setup: Real-time data processing infrastructure
  • Data Catalog: Documentation of available datasets and schemas
  • Data Quality Reports: Monitoring and validation dashboards
  • Premature optimization: Over-engineering data structures before understanding usage patterns
  • Schema rigidity: Creating schemas that are too rigid to accommodate future needs
  • Ignoring real-time needs: Only focusing on batch processing when real-time is required
  • Poor data quality: Not implementing validation leads to downstream issues
  • Cost overruns: Not monitoring storage and compute costs can lead to unexpected expenses